Reduce preparation time and loop readiness with GripTight MAX® Test Plug

星期一 11 六月 2018

"EST group B.V. provided training to CFHI’s team prior to usage of the mechanical plugs which assisted greatly with maintenance, preparation and safe operation throughout the project. The usage of these plugs was hugely beneficial compared to traditional hydro test end caps, as welding and NDT of the end caps was avoided thus resulting in reduced preparation time and loop readiness. Hydro test work using the supplied plugs was carried out with no incidents.” Joe Duncan, Sr. Construction Manager - COOEC Fluor China Heavy Industries

Hydro test work using EST Group's plug

EST Group's training

 


« Back
 

新闻室